000 00962nam a2200277 a 4500
001 264081
003 MOEB
005 20240130020004.0
008 141023t2014 my a gr 000 0 eng d
020 _a9789674002091 (hbk.)
049 _aUNISSA.
050 _aKD2517.E7
084 _aKD2517.E7 A358 2014
100 1 _aChow, Kok Fong
245 1 0 _aAdjudication of construction payment disputes in Malaysia :
_bnavigating the Construction Industry Payment and Adjudication Act /
_cChow Kok Fong, Lim Chong Fong, Oon Chee Kheng
260 _aPetaling Jaya, Selangor, Malaysia :
_bLexisNexis,
_c2014.
300 _axli, 467 p. :
_bill. ;
_c26 cm.
501 _aIncludes index.
650 0 _aConstruction industry
_xCosts affectiveness
650 0 _aConstruction industry
_zMalaysia
700 1 _aLim, Chong Fong
700 1 _aOon, Chee Keng
997 _a1050044800 (UNISSA, c.1) ; RM199.00
997 _a1050051034 (UNISSA, c.2) ;
_112.00
999 _c15739
_d15739
942 0 0 _01